NEWS

News

Genoa -

The construction of the new bridge has begun

The construction of the new bridge over the Polcevera river started with the pole for the stack number 6 being drilled underground. This will be the first of eleven poles supporting the base of stack number 6, all drilled into the ground down to a 46-meter depth. The realization of the infrastructure has thus started in the building site located at the foot of the viaduct, even though they are still invisible from the outside as entirely underground.

1200 21200 1