VIDEOGALLERY

VIDEOGALLERY

October 1, 2019: The positioning at height of the first deck of the #PerGenova bridge

Two huge cranes raise the first span of the new bridge at a height of 50 metres, placing it on piles 5 and 6. It weighs 500 tons and is 50 metres long.
It’s the first part of the deck to appear on the Valpolcevera skyline.